Company |
Lucent Technologies |
Division |
Bell Labs |
Location |
Norcross – United States. |
Company Contact |
William J. Baron, Director |
Source of Reference |
The Management Roundtable, Executive Summit with Dr. Goldratt, April 4-5, 2000, Chicago, IL |
|
IMPLEMENTATION INFORMATION |
Name |
Lucent Technologies |
Location |
Norcross, GA United States |
Industry Segment |
Telecom |
Number of employees |
26000 |
Area |
Optical Cable Development |
Implementation Date |
1998 |
Products |
Develop new leading edge optical cables for telecom industry – both inside the building cables and O |
WHAT WAS DONE? |
|
TOC Applications |
CC |
Processes |
Optical Cable Product development |
|
RESULTS OF IMPLEMENTATION |
|
|
On-time performance
|
From |
40% |
To |
100% |
Percent improvement 60% |
|
Lead times |
|
Resources required |
Percent improvement reduced by 67% |
|
Introduction of new products |
Lead time reduced 50% |
Brief summary |
For Premise Cable products – 100% of projects completed on-time (Compared to 40% before); 8 projects completed before 50/50 points and New Production Introduction (NPI) lead times reduced 50%. For outside cables – NPI lead times reduced 50% and tripled development capacity (17 projects vs. 5 before, with no staff increase). |
|