Where there is inventory – there is capacity!
If you have inventory, be it finished goods or work-in-process (WIP), then you have capacity. I mention this because many of the companies who have inventory also have difficulty delivering on-time. However, the capacity is being wasted.
Do you KNOW, in your gut, that you have excess capacity but never the less still struggle to get caught up and complete orders on-time?
If you’ve answered yes, then check how much inventory you have – even if it is just WIP.
If you have finished goods inventory and your turns are low, then you are spending your capacity making things that are not yet needed while at the same time, you don’t have enough capacity to produce what is due and needed now.
Theory of Constraints Replenishment
What are low inventory turns? If you have much more than a replenishment lead-times worth in stock, then it’s low. Replenishment lead-time is the sum of your manufacturing lead-time and transportation lead-time. If you can get or make something in 3 to 4 weeks, why do you only have 4 turns a year? That is a low turn!
The solution, of course, is to align your production with what your customers are actually consuming. I’m referring to Theory of Constraints Replenishment. (If you’re not familiar with TOC Replenishment, comment on this post and let me know you want to learn more.)
And if you manufacture your finished goods inventory, then you probably also have high WIP.
If your WIP is approximately equal to (or greater than) your quoted lead-time (which would constitute high inventory) then you can improve your performance by reducing the amount of WIP you have.
According to Little’s Law there is a direct correlation between the amount of work-in-process we have and our lead-time. The higher our WIP, the longer our lead-times.
Here’s an illustration showing the relationship between WIP and lead-time: